A carton plant’s power requirement depends on the exact machines and utilities selected. There is no reliable single electrical figure for every corrugation or box-conversion setup. Ask for a connected-load schedule and have a qualified electrician assess the site before equipment is delivered.
List the complete equipment
Write down every proposed stage: reel stand, single facer, pasting or heating arrangement, sheet cutter, stacker, printer slotter, die cutter, laminator and finishing machine where applicable. Include auxiliary systems such as air compressors or glue preparation if the selected models require them. A quotation for the main line may not include every utility load in the final plant.
Ask for model-specific electrical data
Request the supply type, connected load, drive and heating loads, starting requirements, panel location and protective measures for each exact machine. Confirm whether the figures include optional accessories. Do not copy specifications from a different width or older model. Keep the supplier’s electrical drawings with the installation records.
Plan the electrical room and cable route
Place panels where trained staff can reach them without crossing moving material. Protect cables from forklifts, roll handling and wet or adhesive areas. Coordinate cable trays, earthing and emergency isolation with a qualified electrician. The building route should allow future service without dismantling production equipment.
Consider operating pattern
Which machines will run together? How many shifts will operate? Are heating or auxiliary systems continuous or intermittent? These details affect demand and backup planning. The electrician and supplier should review expected simultaneous use, not only the arithmetic total of nameplate values.
Check site readiness before dispatch
Confirm that the approved electrical supply, protection and connections are ready for commissioning. Avoid temporary wiring used to make the first run. Plan a safe test sequence with the installation team and document any corrections. Our installation checklist
Review future expansion
If a printer slotter, die cutter or automatic finishing unit may be added later, discuss the likely electrical route and plant capacity now. This does not mean buying oversized equipment without evidence; it means reserving space and knowing what a later upgrade would require. Our plant upgrade guide
Information to send with a quotation
- List of existing and proposed machines, with model details where known.
- Available site supply and main-panel location.
- Number of shifts and machines expected to operate together.
- Factory floor plan and planned utility routes.
- Any expected future line addition.
Frequently asked questions
Can I use one power figure for all carton plants?
No. Width, automation, heating, drives and auxiliary equipment change the requirement.
Who should confirm the factory supply?
A qualified electrician should review the site against the exact supplier documentation.
Does a quotation’s machine price include electrical installation?
Do not assume it does. Ask for the installation and site-preparation scope in writing.
Should power be checked before ordering?
Yes. Early review can reveal required site work and avoid commissioning delays.